top of page
luis-vidal-+-arquitectos-heathrow_06.jpg
Heathrow T2

The new Terminal 2 (The Queen’s Terminal) opened in 2014 which required highly detailed logistics planning with close collaboration with other contractors on site. Astins was contracted to supply and install partitioning, dry linings and suspended ceiling to the main terminal, which is approximately 28,000 m2 gross internal floor area. 

bottom of page